When AML Scaffolding needed a scaffold partner for maintenance and refurbishment works at the University Hospital of Wales, Altrad Generation Cardiff was ready to help. The project ran for six months and required a tailored scaffold beam and stair tower system built around one of the most restricted, high-footfall sites you will find in the UK.

The Challenge

The Challenge

Working at a live hospital means space is not yours to negotiate. Access on either side of the building was tight. Personnel, materials, and equipment all had to move through confined areas without disrupting an operational site. AML Scaffolding needed versatile access to the hospital cladding at height, with multiple exit points at different levels and a clear stairway route so workers could reach the working level quickly and safely.

The brief was specific. All personnel had to be protected throughout. Access had to be fast. The structure had to accommodate varied working at height configurations. And the whole solution had to be designed, planned, and delivered without adding risk to a hospital environment.

The structural side presented its own demands. The team needed a beam specification capable of carrying the loads the refurbishment work placed on the scaffold, without overcomplicating the build or adding unnecessary labour and supplies to the programme.

The Solution

The Solution

Using our Stair Tower estimating system, the Cardiff team calculated the full height requirement and mapped specific exit points at each working level. Custom technical drawings were produced around the exact site conditions.

For the structural element, our Dessa Engineering software identified that the 1.33 HD Asterix Beam was required alongside our D78 Ubix Beams. That combination simplified the lacing and bracing across the scaffold structure. Fewer Fittings meant less labour on site, reducing both cost and programme time for AML Scaffolding.

The complete solution used Generation Stair Tower alongside 1.33 HD Asterix Beams, D780mm and 450mm Alloy Beams, all supported by custom technical drawings built around the specific site requirements.

The Outcome

The Outcome

Michael Leaman, Director of AML Scaffolding, praised the Cardiff team for identifying a solution to the challenges they faced. Their client was pleased with the result, and despite the product mix and the pressures of working around a live hospital, the Cardiff team delivered a smooth process from order through to completion. AML Scaffolding have since been awarded Phase 2 of the scheme, and Altrad Generation Cardiff will be back on site to support them.

Project Images

cardiff-scaffolding-1.jpg
cardiff-scaffolding-10.jpg
cardiff-scaffolding-12.jpg
cardiff-scaffolding-2.jpg
cardiff-scaffolding-3.jpg
cardiff-scaffolding-6.jpg
cardiff-scaffolding-7.jpg
cardiff-scaffolding-8.jpg
cardiff-scaffolding-9.jpg

Discuss your project

If you are looking for design support and to talk through your project, speak to our experts. What we can provide you:

  • Wind resistance calculations

  • Expert team with extensive experience

  • High-quality products

Contact our specialists

Area Covered: Birmingham North

Area Covered: Birmingham West

Area Covered: Bournemouth

Dominic Sheppard

01202 591255

[email protected]

Area Covered: Brigg

Area Covered: Bristol East

Area Covered: Cardiff

Area Covered: Cardiff Docks

Area Covered: Chelmsford

Area Covered: Chichester

Area Covered: Edinburgh East

Laurence McTernan

0131 552 7534

[email protected]

Area Covered: Edinburgh West

Area Covered: Glasgow East

Area Covered: Glasgow South

Area Covered: Grays

Area Covered: Kings Lynn

Area Covered: Leeds South East

Area Covered: London East / South Ockendon

Area Covered: London West

Area Covered: Luton

Area Covered: Manchester

Area Covered: Newcastle

Kevin Philliskirk

0191 492 1190

[email protected]

Area Covered: Northampton

Area Covered: Norwich

Area Covered: Nottingham

Area Covered: Peterborough

Area Covered: Reading

Area Covered: Rotherham

Area Covered: Tipton - Steelhoard Centre

Altrad Generation Tipton

0800 073 9987

[email protected]

Area Covered: Truro

Area Covered: Widnes

Cardiff

For more information, contact this branch

Our use of cookies

Some cookies are necessary for us to manage how our website behaves while other optional, or non-necessary, cookies help us to analyse website usage. You can Accept All or Reject All optional cookies or control individual cookie types below.

You can read more in our Cookie Notice

Functional

These cookies enable core functionality such as security, network management, and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.

Analytics cookies

Analytical cookies help us to improve our website by collecting and reporting information on its usage.

Third-Party Cookies

These cookies are set by a website other than the website you are visiting usually as a result of some embedded content such as a video, a social media share or a like button or a contact map

Advertising Cookies

These cookies are set by a website other than the website you are visiting to enable personalisation of advertising preferences across ad networks.

Site Choice
Please select preferred site