9 items
Why Choose Genlok Stair Tower?
Replace Ladders with Scaffold Staircases
The Genlok Stair Tower replaces ladder access with a safe scaffold staircase, enabling multiple personnel to climb simultaneously and improving safety on site.
Steel or Aluminium Stair Units
Stair units are available in both steel and aluminium, in 1.5m and 2.0m heights, giving contractors the choice of material to suit project requirements.
Two Tower Configurations
Two footprints are available to suit different sites:
4-Leg (1.8m x 3.0m) — compact solution for confined spaces, requiring fewer components for faster erection. Requires Handrail Post, 0.6m, 0.9m or 3.0m Ledgers, and a MeshDeck landing.
8-Leg (1.8m x 4.4m) — provides a full-width landing at each level.
Loading Platform Capability
Genlok Stair Tower components can also be configured as a loading tower, enabling distribution of pallets of materials to the working level by site forklift or loader. The Loading Bay Tower is built progressively, with working lifts matching those of the facade scaffold.
H3: EN 12810 and EN 12811-1 Compliant
The Genlok Stair Tower complies with European standards EN 12810 and EN 12811-1, and is fully supported by the NASC TG30:24 operational and design guide.
Compliance and Standards
The Genlok Stair Tower complies with European standards for temporary works and scaffolding:
- EN 12810
- EN 12811-1
- NASC TG30:24
Frequently Asked Questions
Q: What is the difference between the 4-leg and 8-leg Genlok Stair Tower configurations?
A: The 4-leg configuration has a footprint of 1.8m x 3.0m and is a compact solution for confined spaces, requiring fewer components for faster erection. It also requires a Handrail Post, 0.6m, 0.9m or 3.0m Ledgers, and a MeshDeck landing. The 8-leg configuration has a footprint of 1.8m x 4.4m and provides a full-width landing at each level. Both configurations use steel or aluminium stair units in 1.5m and 2.0m heights.
Q: Can the Genlok Stair Tower be configured as a loading tower?
A: Yes. Genlok Stair Tower components can also be configured as a loading tower, enabling distribution of pallets of materials to the working level by site forklift or loader. The loading bay tower is built progressively, with working lifts matching those of the facade scaffold.
Q: What standards does the Genlok Stair Tower comply with?
A: The Genlok Stair Tower complies with European standards EN 12810 (performance requirements for facade scaffolding) and EN 12811-1 (temporary works equipment: scaffolds). It is fully supported by the NASC TG30:24 operational and design guide.
Altrad Generation supplies the Genlok Stair Tower scaffold staircase system for hire and sale across the UK. Whether you need a scaffold staircase for a short-term construction project or a long-term industrial contract, our team can advise on the right configuration for your site.
Contact us to discuss your requirements, or browse the full Genlok Stair Tower range to explore individual components.
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Select the variant you wish to add then change the value and click add to quote:
Looking for more than just products? View our complete solutions
Find out more