Project
In January 2026, Altrad Generation Cardiff and Trust Scaffolding were instrumental in the refurbishment of the Bro Cerwyn Centre flat roof. Utilising the innovative Uni-Roof Temporary Roof System, our Cardiff team designed and supplied a 26m x 40m temporary roof, equivalent to the size of 3 tennis courts, to protect the roof area while the essential works were carried out. The scaffold was designed to incorporate suitable access, Edge Protection, and structural support in accordance with current safety standards, ensuring the refurbishment works could be completed safely, efficiently, and without risk of weather related damage to the building’s interior.
Alongside the Uni-Roof Temporary Roof System, the complete solution included 60,000 Scaffold Fittings, 296x 1330mm and 780mm Beams, and the Trax UB Runway System, which provided a weatherproof environment to ensure a quality installation, protected exposed roof areas and internal spaces from water ingress, and safeguarded the numerous skylight openings during removal and replacement, preventing weather related project delays.