The scaffold band and plate from Altrad Generation provides the primary attachment fitting for scaffold sheeting and debris netting to scaffold tube. The steel band wraps securely around the 3.2mm scaffold tube and 4.0mm scaffold tube and the plate gives you a robust tie-off point for all standard sheeting attachment systems.
Available from Altrad Generation alongside the complete scaffold sheeting and debris netting range, scaffold bands and plates work with Monarflex Scaffband, Powerclad Sheeting, cable ties, and all standard sheeting attachment systems.
Scaffold Band and Plate Key Features
Wraps securely around 3.2mm and 4.0mm scaffold tube for a stable attachment base
Steel plate provides a robust tie-off point for all sheeting and netting systems
Compatible with the full Altrad Generation scaffold sheeting range
Reusable across multiple projects when undamaged
Available from Altrad Generation for hire and sale
Complete Scaffold Sheeting System
Build a complete scaffold sheeting system with Altrad Generation bands and plates, Monarflex Scaffband, debris netting, and the full range of scaffold sheeting and debris netting products. Pair with limpet clamps and oyster couplers for additional attachment point options.
Frequently Asked Questions
Q. What is a scaffold band and plate used for?
A. A scaffold band and plate attaches scaffold sheeting, debris netting, and Monarflex products to scaffold tubes. The steel band wraps around the scaffold tube and the plate provides an attachment point for sheeting ties, cable ties, and fastening systems.
Q. What tube size does the scaffold band and plate fit?
A. Altrad Generation scaffold band and plate fittings are designed for 3.2mm and 4.0mm scaffold tube. The band wraps securely around the tube to provide a stable attachment base for sheeting and netting systems.
Q. Is a scaffold band and plate suitable for all scaffold sheeting types?
A. Scaffold band and plate fittings are compatible with Altrad Generation's full range of scaffold sheeting and debris netting products, including Monarflex Scaffband, Powerclad Sheeting, and debris netting. Check the specific sheeting product attachment requirements for your application.
Q. How many bands and plates do I need per scaffold bay?
A. The number of band and plate fittings required depends on the sheeting type and wind load. Your scaffold sheeting supplier will specify the attachment frequency. As a general guide, fix sheeting to every tube at maximum 2m horizontal intervals and at every vertical tube.
Q. Are scaffold bands and plates reusable?
A. Yes. Scaffold band and plate fittings are reusable across multiple projects provided they are not bent, cracked, or otherwise damaged. Inspect them before reuse and discard any fitting showing signs of structural compromise.
Get in Touch with Us
Contact your local Altrad Generation branch to discuss scaffold band and plate fittings and scaffold sheeting systems, or find your nearest branch using our branch locator.